INSTALLAtiON PRINCIPLES

Avoid Voids

Avoid Voids

Secure CC

Secure CC

Prevent Ingress

Prevent Ingress

Hydrate Fully

Hydrate Fully

Prepare the substrate so that surfaces are well compacted, geotechnically stable with a smooth, uniform surface.

It is important to ensure that the CC is Jointed at every overlap between layers and that those layers are Fixed to the substrate.

It is important to prevent water or wind ingress between the CC and the substrate, both around the perimeter of the installation and along the joints.

It is important to properly hydrate CC, using enough water for the quantity of material used and allowing for drying conditions.

 

Fletcher Construction Reinforced Soil Wall (R.S.W) Taupiri, New Zealand Read More 2013 Case Study
Environment Agency Sand Martin Bank Coatham Marsh Nature Reserve, UK Read More 2013 Case Study
Geo Consulting Service Temporary Works Enna, Sicily Read More 2015 Case Study
National Grid Pipe Protection Scunthorpe, UK Read More 2016 Case Study

 

DOWNLOADS

Sign in to access further information

To access Technical Certification and Drawings, please sign-up.

SIGN-UP

If you do not want us to keep you informed of news and updates via email, please check this box.
View our privacy policy here.

Sign up
LOGIN
Reset Password

For more miscellaneous applications downloads, click here:

More Downloads

 

Awards