Network Rail project utilises CC in Somerset

16 July 2018

In October 2017, Concrete Canvas® GCCM* (CC) was used to line a channel at the side of the Three Arch Bridge which runs over the rail line in Sherborne, Somerset. The purpose of the channel was to divert surface water runoff from farmers fields away from an embankment that had previously slipped due to saturation.

The works were carried out by Suttle Projects on behalf of Osborne, for client Network Rail.

Click here to find out more about the installation.