Unigaz uses CC for pipe protection at facility in Lebanon

23 November 2018

In September this year, the Dora Seaside Unigaz facility in Lebanon specified CC for use as a pipe protection method for 10 and 6 inch sea line pipes. The material was required to provide protection from impact, vandalism and seaweed and animal growth on the pipes' surfaces.

The use of CC provided several benefits to the client, including the avoidance of having to raise the pipe lines in order to carry out installation, saving money and time. The flexibility of the pipes also allowed for an easy installation, with the material conforming to the pipes, providing flush contact.

Find out more about just how CC was installed and see the finished project here.