BENEFITS

Cost savings – remediating existing assets can offer significant costs savings and operational efficiencies compared to new-build infrastructure.

Operational efficiencies – CC products offer installation rates typically ten times faster than conventional concrete solutions.

Durability – CC and CCH have excellent abrasion resistance, can withstand extremes of environmental weathering and provide robust protection against puncture, impact and animal damage. Lining concrete infrastructure with CC or CCH greatly increases the operational life and reduces the full life cycle costs of existing assets.

Maintain volume capacity and hydraulic requirement – typically, 5mm CC products are used for concrete remediation, which only nominally affects the volume capacity of any channel or lagoon. A low Manning’s value maintains the hydraulic requirements of any given channel, whilst the flexibility of the material allows for artificial baffling measures for assets requiring the reduction of flow velocities.

 

Remediation, Bowburn, UK

 

 

INSTALLATION PRINCIPALS

Avoid Voids

Avoid Voids

Secure CC

Secure CC

Prevent Ingress

Prevent Ingress

Hydrate Fully

Hydrate Fully

Prepare the substrate so that surfaces are well compacted, geotechnically stable with a smooth, uniform surface.

It is important to ensure that the CC is jointed at every overlap between layers and that those layers are fixed to the substrate.

It is important to prevent water or wind ingress between the CC and the substrate, both around the perimeter of the installation and along the joints.

It is important to properly hydrate CC, using enough water for the quantity of material used and allowing for drying conditions.

WATCH VIDEO

 

Caerphilly County Borough Council Channel Lining Bedwas Colliery, South Wales, UK (Phase 3) Read More 2017 Case Study
PCK Remediation PCK Refinery, Germany Read More 2014 Case Study
South Wales Trunk Route Agent (SWTRA) Remediation A4060, Dowlais, Merthyr Tydfil, South Wales Read More 2017 Case Study
SaskPower Remediation Tazin Lake, Saskatchewan, Canada Read More 2015 Case Study
Exxaro Remediation Lephalale, South Africa Read More 2016 Case Study
Remediation Kenyir Dam, Hulu Terengganu, Malaysia Read More 2017 Case Study
Scottish Power Remediation Dumfries & Galloway, Scotland, UK Read More 2017 Case Study

 

DOWNLOADS

Product Brochures (5)

 
CC Civil Brochure
CC Data Sheet
CC Hydro Brochure
CC Hydro Data Sheet
CC & CCH (M)SDS

Installation Guides (1)

 
CC Installation Guide - Remediation

Case Studies (28)

 
CC Case Study Compilation - Remediation
CC Remediation - Muck Burn Flume, Scotland
CC Remediation - Bowburn, UK
CC Remediation - Mooi River, South Africa
CC Remediation - Yanbu Refinery, Saudi Arabia
CC Remediation - Cerro Prieto, BC, Mexico
CC Culvert Lining - Kirk Burn, Scotland
CC Remediation - PCK Extinguishing Lake, Germany

Sign in to access further information

To access Technical Certification and Drawings, please sign-up.

SIGN-UP

You are about to download some of the more specialised technical information about Concrete Canvas. It is in our legitimate interest to support our clients in interpreting the information and helping you understand whether Concrete Canvas can help in your project. With this intent in mind, we may keep your contact details and try to get in touch.

We will not share your personal data with any 3rd parties and will only store it for a limited amount of time if no common business is achieved. If you object to this, you can contact us at any time and ask us to permanently delete your data.

Sign up
LOGIN
Reset Password

For more Remediation downloads, click here:

More Downloads

 

Awards