Slope Protection | M6 Nr. Spaghetti Junction, Birmingham
700m² of CC8® installed to provide protection to a reprofiled slope
Project Overview
In April 2022, Concrete Canvas® GCCM (CC) was used to provide slope protection to a newly reprofiled embankment under the M6 Motorway – an area commonly known as Spaghetti Junction – and next to a Network Rail cross city line.
The project was part of the wider Flood Alleviation Scheme (Culvert 2A Scheme) for The Environment Agency with involvement from Highways England and Network Rail. The Culvert 2A scheme was designed to upgrade a culvert that runs under the cross city line to allow the surrounding area to flood in the event of storm events. The passive flooding of the area around the culvert would help prevent flooding of nearby businesses and warehousing that are located near the site.
Solution
As the area is to actively flood during storm events, the embankment surrounding the culvert, which is Network Rail land, would need to be protected from erosion. The original design called for a mass poured concrete slab to be installed on the embankment to protect the area from erosion. However, due to the location of the site being under the M6 nr.Spaghetti Junction, access was limited and concerns arose about the delivery of the concrete, the pumps and formwork that would be needed.
Ultimately CC8® was chosen for its need for minimal plant machinery, ease and speed in which it can be installed and its low maintenance.
Design & Installation
- CC8® Bulk Rolls specified
- Slope re-profiled with vegetation removed
- Vertical layup
- Perimeter edges secured within anchor trenches
- CC was connected to existing concrete structures using clamping bar and anchors
- Screwed and sealed overlap joint
- Hydrant and IBC used to hydrate material
Summary
Installation was carried out over several weeks as the installation of the material took place at the same time as other works on site.
Concrete Canvas Ltd worked closely with the contractor and the designer to answer their questions and provide details for the installation of the material from the jointing, termination and hydration to ensure the scheme was a success.