CC Remediation | A4060, Merthyr Tydfil

CC8® used to Remediate Channel along A4060

2875
of CC8® used to remediate a critical drainage channel
10x
the rate of traditional poured concrete
50 Years
minimum design life

Summary

A total of 2,875m2 of CC8® were installed over a 4 week period by a team of 6, in inclement and challenging weather conditions. The re-alignment, widening and lining of the channel will protect the A4060 from flooding and closure, which would otherwise cause significant delays and cost to an important trunk route.

The choice of concrete canvas to line the ditch was a real ‘no brainer’, it allowed us to work in most weather conditions and installation using the tracked excavator and spreader bar meant we were able to install quickly given the challenging conditions underfoot. Definitely a product we would chose to use again.

Ian Dando ALD Plant Hire