Aller au contenu

Rechercher une Concrete Canvas

Lagoon Lining | Kingsbury Oil Terminal, Kingsbury, England

1,700m² of CCH8™ installed for a tertiary containment lagoon

1700m²
of CCH8™ used to line the drainage channel
14 Days
to install including the excavation of the lagoon
300m²
of CC5® was used to provide protection to the outer slopes

Solution

To ensure that the lagoon prevented harmful petrochemicals seeping into the ground a number of lining solutions were considered. CCH8™ was chosen as the material to line the lagoon, providing both containment and hard armour protection.

CCH8™ overlaps thermally welded by Sean Carr Lining Technologies

Design & Installation

  • CCH8™ Bulk Rolls specified
  • Lagoon excavated and graded smooth prior to deployment
  • Transverse and vertical layup
  • Perimeter edges secured in anchor trenches
  • CCH8™ overlaps thermally welded using a Leister Twinny thermal welder with triple track setup
  • Thermal weld joints air channel tested for strength and permeability
  • Customised to fit around pipe penetrations and sump areas
  • 300m2 of CC5™ provided erosion protection to the outer slopes
  • Hydrated using a combination of hydrant and an IBC
Corner, pipe penetrations and sump accomodated

Summary

The installation was carried out in good weather over a period of 2 working weeks, including the excavation of the lagoon, with a total of 1,700m2 of CCH8™ installed by a team of 4.

Completed installation
Ariel view of completed install

Ready to line your lagoon with CC Hydro™