Case Studies Case Studies, Concrete Canvas, Concrete Remediation, EN, Public Works, UK 2020, accomodate varying profile, adhesive sealant, anchor trench, anchor trenched, anchor trenches, bolts, bolts and washers, Bulk, bulk rolls, Cardiff, Cardiff Council, CC, CC8, CC8 bulk, CC8 bulk rolls, channel, Channel Lining, channel profile, channel remediation, channel repair, clamping bar, complex, complex access, complex conditions, concrete, Concrete Canvas, Concrete Remediation, concrete repair, conventional concrete, dam, difficult conditions, disc cutter, ditch, ditch lining, ditch remediation, ditch repair, easier to install, easy, easy to install, EDS, Edwards, Edwards Diving, Edwards Diving Services, Edwards Diving Services Ltd, eliminate voids, eroded, erosion, erosion control, erosion prevention, erosion protection, fast, fast install, fill voids, flexibility, flexible, flood, flooding, floods, GCCM, gravel, ground pegs, hose, hose pipe, hosepipe, inclement conditions, inclement weather, irregular, irregular channel, irregular channel profile, large voids filled, loose gravel, low alkaline reserve, low mass, low washout rate, maintain hydraulic capacity, marine cement, masonry, masonry wall, mortar, moved by hand, municipal, over pump, over pumping, over-pumped, overpump, overpumped, overpumping, poured concrete, prevent inress, prevent undermining, prevent uplift, prevent washout, prevent water damage, prevent water ingress, properties, public works, quick, quick install, quick to install, rapid, rapid install, reduce flood risk, reduce permeability, Remediation, residential, risk of washout, sand bags, sandbag dam, sandbags, September 2020, South Wales, termination bar, through bolts, thru bolts, ton, tongwyn, Tongwynlais, transported by hand, transverse, transverse layers, UK, undermining, uplift, varying channel profile, varying profile, voids filled, Wales, washers, washout, water pump, water pump and hose