Case Studies (23)
- CC Compilation – Petrochem
- CC & CCH Compilation – Bund Lining
- CC Compilation – Remediation
- CCH – Remediation – Qatar
- CCH Tank Lining – Grangemouth Refinery, Scotland
- CCH Lagoon Lining – Kingsbury, UK
- CCH Lagoon Lining – A23, Brighton, UK
- CCH-Containment-Shaybah-Pyrophoric Treatment Area-Saudi Arabia
- CCH Containment – Great Oxendon, England, UK
- CCH Channel Lining – Logan Reservoir, Scotland
- CCH Tank Remediation – Central Europe Biogas Plant
- CCH Containment – Dubai, UAE (Emirates)
- CCH Bund Lining – Milford Haven, Wales, UK
- CCH Bund Lining – Dhahran, Saudi Arabia
- CCH Remediation – Durham, England, UK
- CCH Slope & Erosion Protection – Dhahran, Saudi Arabia
- CCH Channel Lining – Jubail, Saudi Arabia
- CCH Bund Lining – Gazeley, Suffolk, UK
- CCH Bund Lining – Kotka, Finland
- CCH Containment – St Quentin Zoo, France
- CCH Tank Lining – Lephalale, South Africa
- CCH Containment Area – Haradh, Saudi Arabia
- CCH Bund Lining – Anaerobic Digestion Plant, UK
Technical Certification (12)
- CC & CCH ETA
- Tech Note 1: Specification Standard ASTM D8364
- Tech Note 2: Compressive Strength ASTM D8329
- Tech Note 3: Flexural Strength ASTM D8058
- GCCB Drop-in-Spec
- CC Hydro Hydrocarbon Impermeability
- CC Hydro Membrane Durability
- CC Hydro Chemical Resistance
- CC Hydro Chemical Resistance
- CC Hydro 14 Day Exposure Test Petrol Diesel
- CC Hydro Fire Certification
- CCH BBA Certification