Bund Lining | Abu Dhabi, UAE

3,000m² of CC5 installed to armour a pipe protection bund

3000
of CC5 was used to line the pipe protection bund
5 Days
to complete during high temperatures
100mm
screw spacings for warmer climate jointing

Solution

Other conventional methods, such as Bitumen, can quickly degrade under high levels of UV exposure and can have a huge environmental
impact. In addition there is risk of wildlife damage, to which CC would be much more resistant.

Design & Installation

  • Bulk Rolls of CC5 were specified
  • Bund re-profiled into a uniform surface
  • Vertical layup
  • Screwed and sealed overlap joints
  • Perimeter edges secured in anchor trenches
  • 3,000 gallon truck used to hydrate material
Completed installation

Summary

3,000m2 of CC5was installed in 5 days in high temperatures. The client deemed the trial a huge success and is looking to specify CC on similar future projects.

Ensure Long-Term Erosion Defence For Your Bunds