Channel Lining | Brecon, Wales, UK

CC5® lined 270m² of a damaged leat at Cynrig Hatchery

270
of CC5® installed for erosion protection
3
Operatives completed the works without heavy plant
5 hours
from start to finish installation

Design & Installation

  • CC5® Batched Rolls specified

  • Transverse layup

  • Leading edge anchor trenched into poured concrete base beneath footbridge

  • Other perimeter edges secured in anchor trenches backfilled with soil

  • Screwed overlap joints

  • Ecologically sensitive rocks replaced on CC to create natural baffling

CC5® was captured within anchor trenches and hydrated

Summary

A total of 270m2 of CC5® was used in the project, which was completed by 3 NRW operatives in less than five hours.

Completed Installation

4 Years After Installation

CC successfully ‘greening’, blending in with its surroundings
CC is providing durable erosion control, successfully coping with varying flow