Channel Lining | Five Mile Lane, Barry, UK
CC8® used to line a crest channel in Barry
Project Overview
In June 2018, 2,250m2 of Concrete Canvas® GCCM (CC) was specified to provide a channel lining solution to a newly constructed drainage channel that was cut into the eastern crest of the new road cutting. The design and build contract was undertaken by Alun Griffiths (designed by Jacobs) for the Vale of Glamorgan Council.
Solution
Given the high volume and flow rates anticipated from the adjacent agricultural land, the channel required lining to prevent scouring of the channel invert and stop water ingress into the cutting. CC was chosen due to its speed and ease of installation, minimal in-service maintenance requirement and its low logistical footprint during installation.
Design & Installation
- CC8™ Bulk Rolls specified
- Long reach excavator used to excavate channel
- Transverse Layup
- Perimeter edges secured in anchor trenches
- Screwed overlap joints
- Hydrated using a 4000-litre bowser and pump
Summary
Over 2,250m² of CC8® material was installed in less than four days by a crew of 4, using minimal plant.