CC8® used to line a crest channel in Barry

2250
of CC8® used to line irrigation canal
4 Days
to complete the project
4 Person
installation team carried out the work, using minimal plant

Design & Installation

  • CC8 Bulk Rolls specified
  • Long reach excavator used to excavate channel
  • Transverse Layup
  • Perimeter edges secured in anchor trenches
  • Screwed overlap joints
  • Hydrated using a 4000-litre bowser and pump
Upstream View of Channel

Summary

Over 2,250m² of CC8® material was installed in less than four days by a crew of 4, using minimal plant.

Completed Installation

“Concrete Canvas offered a quicker to install erosion control solution which saved three weeks in the works programme. There was the added advantage work could continue during wet weather. The material was installed by a small team of three ground workers and a machine operator who found the installation process very simple. Overall, I was impressed with advantages offered by installing Concrete Canvas and will look to use the material on future projects.”