120m² of CC8® used to formalise a drainage channel

120
of CC8® was used for erosion control
100
of CC8® installed per hour
Minimal
plant used to install CC

Design & Installation

  • CC8® Bulk Rolls specified
  • Channel excavated and compacted
  • Transverse layup
  • Fixed to headwall using masonry fixings
  • Screwed joints
  • Intermediate fixings used
  • Edges secured in anchor trenches with ground pegs
  • Hydrated using over-pumped water
Deployment of CC by hand
Profile view of completed channel
Channel revisited 1 year after installation