Bund Lining | Undisclosed, UK

25,500m² of CC5® installed as a protective liner to clay bunds

22500
of CC5® used to line the clay bunds
Staggered delivery
to minimise on-site storage and provide flexibility to works
0
maintenance required to control vegetation since project completion

Solution

The bunds were being upgraded with a containment geomembrane and soil filled geocell fire protection layer. To prevent vegetation growth and therefore reduce continued maintenance to trim vegetation and prevent a fire risk, it was decided to line the bunds with a hard armour facing. CC5® was specified as a solution to prevent vegetation growth and maintain volume capacity due to its 5mm thickness.

Design & Installation

  • CC5® Bulk Rolls specified
  • Staggered delivery to minimise on-site storage and provide flexibility to programme of works
  • Bunds de-vegetated and graded into uniform profile
  • Transverse layup
  • Screwed and sealed overlap joints
  • Perimeter edges secured in anchor trenches
  • Hydrated using mains water supply
Hydrated using mains water supply

Summary

In total 22,500m2 of CC5® was installed in July 2013. Since then, maintenance to control vegetation has not been required.

CC easily accomodating existing pipework
Corner detail