CCX-M® installed to line a storm water ditch

16368ft²
of CC-X-M® used to provide erosion protection
3 Days
to complete installation
8 months
on from install, CCX® sucessfully preventied vegetation growth

Solution

Traditional methods such as pesticides would have been used to manage vegetation growth within the ditch; however, the weed growth would continue after applying treatment, resulting in continuous maintenance costs.

SLPU decided that lining the ditch with CCX-M®, a hard armor solution, would be a more cost effective and permanent solution to provide weed suppression.

Completed installation during cold weather conditions
Completed installation

Design & Installation

  • Vegetation growth removed and channel regraded
  • CCX-M® Bulk Rolls specified
  • Transverse layup
  • Screwed & sealed joint
  • Edges secure with pegs within anchor trenches
  • Hydrated using a water truck and hose

Conclusion

The project took 3 days to complete, with a team of 5 from SLPU installing 16,368ft2 of CCX-M®. The SPLU were extremely impressed with how quickly and easily CCX-M® could be installed compared to other conventional solutions. They monitored the ditch and noted that 8 months on from installation, the CCX-M® has successfully prevented any vegetation growth within the ditch. They also noted that
the ditch continued to operate in freezing tempartures and snowy conditions.