WHY USE CC?

CC is an ideal solution for bund lining and containment applications, providing tested weed suppression and protection against weathering erosion, abrasion and impact from burrowing animals. CC is rapidly installed, with a small logistical footprint, reducing time on site and disruption to operations.

CC Hydro™ can be laid directly onto existing profiles without loss of volume capacity and has excellent resistance to a wide range of chemical reagents while also providing clear leak detection visibility.

CC & CC Hydro Bund Lining

 

 

INSTALLATION PRINCIPLES

Avoid Voids

Avoid Voids

Secure CC

Secure CC

Prevent Ingress

Prevent Ingress

Hydrate Fully

Hydrate Fully

Prepare the substrate so that surfaces are well compacted, geotechnically stable with a smooth, uniform surface.

It is important to ensure that the CC is jointed at every overlap between layers and that those layers are fixed to the substrate.

It is important to prevent water or wind ingress between the CC and the substrate, both around the perimeter of the installation and along the joints.

It is important to properly hydrate CC, using enough water for the quantity of material used and allowing for drying conditions.

WATCH VIDEO

 

Saudi Aramco Bund and Channel Lining Rig Site, Dhahran, Saudi Arabia Read More 2017 Case Study
Barhale Bund Lining Gazeley, UK Read More 2017 Case Study
M/s GASCO Bund Lining - Pipe Protection Abu Dhabi, UAE Case Study January 2016
Elin Oil Hellenic Petroleum Company SA Bund Lining Athens, Greece Read More 2017 Case Study
Santos Bund Lining Cook, Queensland, Australia Case Study May 2015
SEMLogistics Bund Lining Milford Haven, UK Read More 2016 Case Study

 

DOWNLOADS

Product Brochures (5)

 
CC Civil Brochure
CC Data Sheet
CC Hydro Brochure
CC Hydro Data Sheet
CC & CCH (M)SDS

Case Studies (18)

 
CC Case Study Compilation - Bund Lining
CC Bund Lining - Classified, UK
CC Hydro Bund Lining - Classified, UK
CC Bund Lining - Athens, Greece
CC Bund Lining - Abu Dhabi Pipe Protection
CC Bund Lining - Oman
CC Bund Lining - Santos, Cook, Australia
CC Bund Lining - Buru Energy - Ungani, Australia

Sign in to access further information

To access Technical Certification and Drawings, please sign-up.

SIGN-UP

You are about to download some of the more specialised technical information about Concrete Canvas. It is in our legitimate interest to support our clients in interpreting the information and helping you understand whether Concrete Canvas can help in your project. With this intent in mind, we may keep your contact details and try to get in touch.

We will not share your personal data with any 3rd parties and will only store it for a limited amount of time if no common business is achieved. If you object to this, you can contact us at any time and ask us to permanently delete your data.

Sign up
LOGIN
Reset Password

For more Bund Lining downloads, click here:

More Downloads

 

Awards