WHY USE CC?

Traditional solutions such as sprayed bitumen and concrete are becoming increasingly prohibited by environmental agencies due to their adverse effects of local ecologies. CC’s low alkaline reserve, washout rate and embodied carbon mean it can be safely installed in live water courses without adverse effects.

Unlike expensive pre-formed GRP sections, heavy pre-cast concrete sections or pumped concrete solutions, CC can be supplied in man-portable batched rolls which do not require plant equipment or specialist contractors for installation. CC’s BBA certification means it has a design life of up to 120 years, greatly increasing the operational life and reducing life cycle costs of existing assets.

 

INSTALLATION PRINCIPLES

Avoid Voids

Avoid Voids

Secure CC

Secure CC

Prevent Ingress

Prevent Ingress

Hydrate Fully

Hydrate Fully

Prepare the substrate so that surfaces are well compacted, geotechnically stable with a smooth, uniform surface.

It is important to ensure that the CC is jointed at every overlap between layers and that those layers are fixed to the substrate.

It is important to prevent water or wind ingress between the CC and the substrate, both around the perimeter of the installation and along the joints.

It is important to properly hydrate CC, using enough water for the quantity of material used and allowing for drying conditions.

WATCH VIDEO

 

Igroup/ Balfour Beatty Living Places/ West Sussex County Council Culvert Lining Cooks Bridge, Midhurst, West Sussex Read More 2017 Case Study
Transport Scotland Culvert Lining Laurencekirk, Scotland Read More 2017 Case Study
Lewis County Culvert Lining Lewis County, Washington, USA Read More 2014 Case Study
Balfour Beatty Living Places / West Sussex County Council Culvert Lining Halfway Bridge, West Sussex, UK Read More 2018 Case Study
WBHO Culvert Lining N4 Watervalboven, Mpumalanga Read More 2016 Case Study
AMCO-GIFFEN Culvert Lining - Tidal Stream Hartlepool, UK Case Study September 2018

 

DOWNLOADS

Product Brochures (3)

 
CC Civil Brochure
CC Data Sheet
CC & CCH (M)SDS

Case Studies (14)

 
CC Case Study Compilation - Culvert Lining
CC Culvert Lining - Kirk Burn, Scotland
CC Culvert Lining - Earlston, Scotland
CC Remediation - Culvert Repair, Scotland
CC Culvert Lining - New Zealand
CC Culvert Lining - Waterval Boven, South Africa
CC Case Study Compilation - Utilities
CC Culvert Lining - Cooks Bridge, UK

Sign in to access further information

To access Technical Certification and Drawings, please sign-up.

SIGN-UP

You are about to download some of the more specialised technical information about Concrete Canvas. It is in our legitimate interest to support our clients in interpreting the information and helping you understand whether Concrete Canvas can help in your project. With this intent in mind, we may keep your contact details and try to get in touch.

We will not share your personal data with any 3rd parties and will only store it for a limited amount of time if no common business is achieved. If you object to this, you can contact us at any time and ask us to permanently delete your data.

Sign up
LOGIN
Reset Password

For more Culvert Lining downloads, click here:

More Downloads

 

Awards