
Case Studies (20)
-
CC Compilation – Petrochem
-
CC & CCH Compilation – Bund Lining
-
CC Compilation – Remediation
-
CCH Lagoon Lining – Kingsbury, UK
-
CCH-Containment-Shaybah-Pyrophoric Treatment Area-Saudi Arabia
-
CCH Containment – Great Oxendon, England, UK
-
CCH Channel Lining – Logan Reservoir, Scotland
-
CCH Tank Remediation – Central Europe Biogas Plant
-
CCH Containment – Dubai, UAE (Emirates)
-
CCH Bund Lining – Milford Haven, Wales, UK
-
CCH Bund Lining – Dhahran, Saudi Arabia
-
CCH Remediation – Durham, England, UK
-
CCH Slope & Erosion Protection – Dhahran, Saudi Arabia
-
CCH Channel Lining – Jubail, Saudi Arabia
-
CCH Bund Lining – Gazeley, Suffolk, UK
-
CCH Bund Lining – Kotka, Finland
-
CCH Containment – St Quentin Zoo, France
-
CCH Tank Lining – Lephalale, South Africa
-
CCH Containment Area – Haradh, Saudi Arabia
-
CCH Bund Lining – Anaerobic Digestion Plant, UK
Technical Certification (11)
-
Tech Note 1: Specification Standard ASTM D8364
-
Tech Note 2: Compressive Strength ASTM D8329
-
Tech Note 3: Flexural Strength ASTM D8058
-
GCCB Drop-in-Spec
-
CC Hydro Hydrocarbon Impermeability
-
CC Hydro Membrane Durability
-
CC Hydro Puncture Resistance
-
CC Hydro Chemical Resistance
-
CC Hydro 14 Day Exposure Test Petrol Diesel
-
CC Hydro Fire Certification
-
CCH BBA Certification
Drawings (10)
-
CCH Layout – Pipe Penetration – CAD dwg
-
CCH Layout – Pipe Penetration – CAD pdf
-
CCH Joint – Thermally Welded Overlap – CAD dwg
-
CCH Joint – Thermally Welded Overlap – CAD pdf
-
CCH Layout – Bund Lining Section – CAD dwg
-
CCH Layout – Bund Lining Section – CAD pdf
-
CCH Layout – Bund Lining Corner – CAD dwg
-
CCH Layout – Bund Lining Corner – CAD pdf
-
CCH Detail – Wall Termination – CAD dwg
-
CCH Detail – Wall Termination – CAD pdf